ESS MODERN AG
行业解决方案

能源效率 适用于各行各业

从超市到重工业:我们的ESS系统针对每个应用领域进行优化。发掘您的节能潜力。

各行业节能潜力

依据VDE应用规则VDE-AR-E 2055-1。

建筑业

17,22 %

生产工厂

12,91 %

零售、超市

16,83 %

医院/诊所

11,48 %

学校

20,28 %

游泳池

11,48 %

酒店、餐厅

10,71 %

办公室

15,30 %

烘焙业

12,00 %

肉类加工

13,52 %

其他食品、物流、纺织、服装

10,33 %

洗衣业

13,08 %

农业

15,25 %

园艺业

15,30 %

机场

12,24 %
STUDIES & FIELD TRIALS

Six robust field trials on voltage optimisation

Controlled voltage optimisation within permissible limits can reduce active power and energy consumption of voltage-dependent loads. The magnitude depends on load mix, supply voltage and operating conditions.

Retail / building

AVR department store

Real site with over 5 GWh annual consumption, 1,250 kVA voltage regulator, bypass vs. active mode, one-second logging (Class 0.2s).

−12,02 % kWSource
Hospital + university

Brown / Fsadni

Two large public buildings in the UK with installed voltage optimisation units, evaluating real consumption data before and after installation.

9,5 – 13 %Source
Industrial building

ORNL / IEEE

Behind-the-meter conservation voltage reduction in an industrial plant, with methods to predict site-specific effects, validated with field data.

CVR validatedSource
Distribution grid + AMI

Pepco Maryland

7 CVR substations and 7 control substations, around 49,000 customers, voltage reduced by 1.5 %, econometric evaluation with control group.

−1,4 % kWhSource
Devices / loads

ZIP coefficients of modern loads

Laboratory determination of load models for residential, commercial and industrial loads. Explains why voltage optimisation acts differently per site.

Load mix explainedSource
Office building / showroom

ESS test lab Rostock

Own ESS test setup with devices, loads and generation in an office building. Setup and trials take place in autumn 2026.

Data from autumn 2026
1

The principle is proven

Voltage-dependent loads draw less active power at reduced voltage.

2

The magnitude is site-specific

Load mix, supply voltage, motors, electronics and operating state determine the effect.

3

An honest statement

Studies show savings in the single- and double-digit percentage range. The concrete potential is determined by on-site measurement and analysis.